Welcome to BeiErBian Group Co., Ltd!

EN | CN | Sitemap | RSS | XML

National Service Hotline:

010-58612111

电力变压器厂家,高低压成套设备厂商
Your current location : Home >> News >> Industry news

State Energy Group Chongqing power plant 2 × 660MW environmental protection relocation project pile foundation construction project bidding announcement

2021-03-18 09:35:45
Times

Polaris power network learned that the national energy bidding network of China National Energy Group recently released the Chongqing power plant 2 of Chongqing company × The details are as follows:


1. Bidding conditions


The name of the bidding project is Chongqing power plant 2 of Chongqing company × 660MW environmental protection relocation project pile foundation construction, the project bidding number is cezb210501286, the bidder is Shenhua Guoneng Chongqing Power Plant Co., Ltd., the project unit is Shenhua Guoneng Chongqing Power Plant Co., Ltd., and the fund source is self raised. The bidding agency is China Shenhua International Engineering Co., Ltd. The project has met the bidding conditions, and now the project is subject to public bidding after domestic qualification examination.


2. Project overview and bidding scope


2.1 project overview, bidding scope and bid (package) Division: 2.1.1 project overview:


Shenhua Guoneng Chongqing power plant 2 × The 660MW environmental protection relocation project is located in the coal electric chemical industrial park of Wansheng economic and Technological Development Zone, Qijiang District, Chongqing, with a construction period of 22 months. The south side is close to the existing Guodian Wansheng Hengtai power plant, the north side is close to the proposed guanba site of Chongqing Nantong low calorific value coal power generation project, the west side is adjacent to the planned railway station, and the east side is across the road from Dongfang hope Coal Chemical Co., Ltd. The proposed site is a typical Eroded Hilly landform, which is composed of gentle gullies, mounds and gentle slopes in front of the mountain. The ground elevation is about 487m ~ 518m, and the relative elevation difference is generally less than 30m. The middle of the site is low, and the East and west sides are high. The East and West ridges are surrounded by terraced paddy fields, and part of the site is dry land. Several gullies meander through the site. The pile foundation is constructed in the backfilled earthwork area. 5576m3 has been constructed in the early stage, and the remaining 10420m3 is about.


Manufacturer of high and low voltage complete equipment

2.1.2 bidding scope:


1) Scope of work: pile foundation construction of main power house, boiler room, flue support, dust collector support, desulfurization island and chimney structure, 500kV outdoor site framework, coal crusher room, coal yard, bucket wheel foundation, transfer station, coal conveying trestle, cooling tower and some auxiliary buildings.


Including: pile location area calibration, excavation and backfilling, earth and rock outward transportation; Preparation of machines and tools, displacement and positioning of pile driver, drilling (including deviation hole correction measures); Installation and removal of protection barrel; Mud production, wall protection and surplus mud cleaning and transportation; Fabrication and installation of reinforcement cage and acoustic pipe, sediment removal, underwater concrete pouring and crane coordination; Chisel the pile head, deal with the collapse, transport the dregs in the yard (within 150m), cooperate with various related tests, etc.


2) The construction period of this project is tentatively 90 days.


The specific work scope, content and requirements are detailed in the contract terms and technical requirements.


3) Others:


Implement the group's overall development strategy of "one goal, three types, five modernizations and seven first-class", and build a safe, efficient and first-class thermal power plant in accordance with the clean, integrated, refined and intelligent development direction.


Quality and progress control objectives: strictly implement the requirements of "green thermal power plant construction guidance" of national energy group, and implement fine management in the whole process of project construction. The quality of the project is qualified.


4) Quality standard


Abide by the regulations, specifications, technical standards, construction, installation and environmental protection regulations issued by the state, the former Ministry of electric power and the State Electric Power Corporation, and the regulations on power plants with similar capacity, scope and nature; Comply with relevant standards, systems and management measures of national energy group. After signing the contract, if the domestic regulations, specifications and technical standards are significantly modified or new regulations, specifications and technical standards are issued, the latest regulations, specifications and technical standards shall be followed.


The construction quality inspection and evaluation standard of the project is implemented according to the series of inspection and evaluation standards of "code for acceptance and evaluation of construction quality of electric power construction" (DL / T 5210, current effective version), and the qualified rate of quality inspection and evaluation of sub project reaches 100%.


The project fully implements the fine management of engineering construction, clean and clean construction, builds a green thermal power plant, and strives to create a national high-quality project. The bidder is encouraged to put forward higher quality standards and implement them in the project. When bidding, all bidders must clearly define the objectives, indicators and measures to achieve high-quality finished products.


2.2 others:/


3. Qualification requirements of bidders


3.1 qualification conditions and performance requirements:


【1】 Qualification requirements: (1) the bidder shall be an independent legal person or other organization registered in accordance with the law, and shall provide valid supporting documents.


(2) The bidder shall have and provide effective foundation and foundation engineering certificate issued by national housing and urban rural construction department


First class qualification certificate for industrial contracting.


(3) The bidder shall have and provide effective work safety license issued by work safety supervision and management department.


(4) The bidder shall have and provide effective quality, environment, occupational health and safety management system certification.


【2】 Financial requirements:/


【3】 Performance requirements: performance requirements: from March 2016 to the deadline for bidding (subject to the date of signing the contract), the bidder must have at least two contracts for the construction of bored pile foundation with rotary drilling rig of 600 MW and above thermal power units, and all of them have been successfully put into operation for one year or more. The bidder shall provide a scanned copy of the contract and corresponding user certificate that can prove the performance requirements of this bidding. The scanned copy of the contract shall at least include the seal page of both parties, the date of signing the contract, the scope of work and key technical parameters, etc; The user certificate shall be sealed by the end user, and can be the completion acceptance certificate, use certificate, return visit record or other materials that can prove that the subject matter of the contract has been successfully put into operation for one year or more.


【4】 Reputation requirements:/


【5】 Qualification requirements for Project Manager: (1) the bidder shall provide the effective first class registered constructor qualification certificate (Construction Engineering Major) and effective class B safety production assessment certificate for the proposed project manager.


(2) From March 2016 to the deadline for bidding (subject to the date of signing the contract), the bidder shall have at least the project manager's work performance in the construction of bored pile foundation of two 600MW and above thermal power generator sets with rotary drilling rig, and the bidder shall provide supporting documents that can prove the project manager's performance, It can be sealed materials such as contract, completion acceptance certificate or user certificate (the above materials should reflect project name, project scale, project manager, completion / commissioning time and unit name)


【6】 Other key personnel requirements:


Technical director:/


Person in charge of safety: the bidder shall provide valid certificate C of safety management personnel qualification certificate of the proposed person in charge of safety.


Person in charge of quality:/


【7】 Other requirements: the qualification and performance of parent and subsidiary companies shall not be borrowed from each other


Note: the qualification and performance of parent and subsidiary companies shall not be borrowed from each other.


4. Acquisition of bidding documents


4.1 those who intend to participate in the bidding must complete the registration of suppliers of national energy group in "national energy bidding network" () before purchasing the bidding. The registered bidders are not allowed to repeat the registration. For details of registration method, please refer to: home page of national energy bidding network → help center → operation instructions for bidder registration, bid purchase, payment method, etc.


4.2 way to purchase the bidding documents: the registered bidders are requested to log in the "bidder business system of national energy bidding network" to purchase the bidding documents online.


4.3 the starting time for purchasing bidding documents is 2021-03-17 09:00:00, and the deadline for purchasing bidding documents is 2021-03-23 16:30:00.


4.4 the price of each set of bidding documents is RMB 2000.0 yuan per lot (package) and the first package is non refundable. The first package of technical data deposit is 0.0 yuan, which will be returned when the technical data is returned (without interest).


4.5 potential bidders who fail to obtain the bidding documents in accordance with the requirements of this announcement shall not participate in the bidding.


4.6 others:/


5. Reading of bidding documents and preparation of bidding documents


The project adopts full electronic bidding mode. The bidder must download the bidding document making tool of national energy bidding network and relevant operation manual from the "business system of bidders of national energy bidding network" and "Component download" for operation. The specific operation process is as follows:


1) The bidder can log in to the bidder business system of national energy bidding network by himself / bidhy.


2) Click the "help center" button at the top right to download the user manual of bidding system - electronic bid (bidder's manual).


3) Click the "Component download" button at the top right to download and install the "national energy bidding network driver installation package" and "national energy bidding network bidding document making tool" in the pop-up page.


Note: the bidding document of this project is in a special format. The bidder must complete the above operations before browsing the bidding document.


4) The bidder must apply for the CA digital certificate to complete the preparation of bidding documents and the bidding of this project. For the CA digital certificate processing process, please refer to the homepage of national energy bidding network → help center → digital certificate processing process and instructions of national energy bidding network electronic bidding project.


Note: the bidder shall apply for the CA digital certificate as soon as possible. If the CA digital certificate is not applied or the certification of Ca digital certificate is expired, the subsequent bidding items cannot be handled.


5) The bidder shall prepare the bidding documents in the "bidding document making tool of national energy bidding network" according to the requirements of the bidding documents. Please refer to the user manual of bidding system - electronic bid (bidder's manual) for specific operation. The following chapters are key chapters. Please read them carefully.


Chapter 1.1-1.7 (system preparation)


Chapter 1.9 (CA lock binding)


Chapter 2.5 (document collection)


Section 2.9 (bid opening Hall)


Chapter 3.1 (installation of bidding document making tools)


Section 3.2 (preparation of electronic bidding documents)


6. Submission and opening of tender documents


6.1 the deadline for submission of bidding documents (deadline for bidding, the same below) and the time for bid opening are 2021-04-13 09:00:00 (Beijing time). The bidder shall submit the electronic bidding documents through the bidder business system of national energy bidding network before the deadline.


6.2 if the tender documents are overdue, the "bidder business system of national energy bidding network" will reject them.


6.3 place of bid opening: open the bid through the "bidder business system of national energy bidding network" without on-site bid opening ceremony.


7. Others


/


8. Media for announcement


This bidding announcement is issued on the national energy bidding website () and China Bidding public service platform () at the same time.


9. Contact information


Bid inviting party: Shenhua Guoneng Chongqing Power Plant Co., Ltd


Address: 88 Xinhua Road, Wansheng economic and Technological Development Zone, Chongqing


Postal Code: 400805


Contact person: Yang Zheng


Tel: 023-68516750


mail box: 17034165@chnenergy.com.cn


Bidding agency: China Shenhua International Engineering Co., Ltd


Address: 21 / F, No.5 office building, enterprise world, no.56-3 Ruitian Road, Yuzhong District, Chongqing


Post code: 400010


Contact person: Wang Gang


Tel: 023-63602725


mail box: 20002977@chnenergy.com.cn


Customer service hotline: 010-58131370

label

qrcode.png

扫一扫 访问官网

contact

Tel:010-58612111

E-mail:bjbeb@bjbeb.com

Website:www.bjbeb.com

Add:3 Rongjing East Street, Beijing Economic and
   Technological Development Zone, Beijing

Specializing in ,Welcome to inquire!